Recently, our plumbing team was called to investigate a water leak coming from a fire service line located in a busy driveway. What looked like a simple leak on the surface turned out to be a complex repair on a 150mm galvanised steel pipe encased in concrete, with multiple branches and the mains water supply close by.
On arrival we found:
A 150mm galvanised steel fire service
Pipework fully encased in concrete
Multiple branches connected to the main line
The property’s mains water supply running adjacent to the fire service
Limited working space in a shared driveway
This combination made excavation and exposure particularly challenging. Any damage to neighbouring services could have resulted in additional outages and costly repairs.
The Challenge
Access: The pipework and sluice valve were buried deep, surrounded by concrete and compacted material.
Congestion: Fire service branches and the nearby mains supply meant our team had to expose the line with millimetre-level care.
Time constraints: The fire service needed to be back in operation as quickly as possible to maintain compliance and safety for building occupants.
Water management: Groundwater and residual water in the line had to be controlled to allow a clean, safe repair.
Our Approach
1. Careful excavation and exposure
Our crew began by saw-cutting and breaking out sections of the driveway to gain access. Using controlled excavation, they slowly exposed the pipework and sluice valve, constantly checking for other services in the trench. Dewatering pumps were used to keep the work area clear of muddy water.
2. Isolation and planning the repair
Once the system layout was fully visible, the team:
- Identified the best isolation points
- Confirmed the configuration of the branches and connection to the mains
- Measured the pipe size and condition to select the correct repair solution
3. Working with trade suppliers
Working closely with our trade suppliers, we sourced the correct repair clamps, fittings and valve components to suit the 150mm galvanised steel fire service. Quick turnaround on materials was critical to keeping the job within a single day.
4. Repair and reinstatement
With isolation in place and materials on site, the team:
- Removed and replaced the defective sluice valve section
- Installed heavy-duty repair clamps and new fittings on the fire service
- Reinstated the line, gradually re-pressurising and checking for leaks
- Confirmed that the fire service was operating as intended
Once testing was complete, the trench was backfilled and compacted, leaving the area safe and ready for driveway reinstatement.
The Outcome
Despite the complexity underground, the project was completed within one day. Key outcomes included:
Fire service exposed, repaired and reinstated with minimal disruption
No damage to the adjacent mains water supply
Downtime for occupants kept to an absolute minimum
A compliant, reliable fire service ready to protect the building